- Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 6:30 23/2 to 4:30 (IST) 24/2/2025. We apologize for the inconvenience.
- Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.
Part Number |
Minimum Order Qty. |
Volume Discount |
Days to Ship |
Basic Working Load (t) |
Maximum Clamp Width (mm) |
h1 (mm) |
Mass (kg) |
Features |
Application |
B (mm) |
t (mm) |
T (mm) |
b (mm) |
S.P. (Distance between Safety Points) (mm) |
D (mm) |
d (mm) |
L(MAX) (mm) |
h2 (mm) |
H1 (mm) |
H2 (mm) |
Amount Of Content |
|
₹ 19,875.53
|
1 Piece(s)
|
|
5 Day(s) or more
|
1 |
40 |
117.0 |
2000 |
Manual effort is not required when mounting the clamp due to the spring action and the clamp does not come off even in no-load state |
Clamp for Lateral (Horizontal) Lifting of Steel Plates / Boards / Road Plates / H-Shaped Steel, etc. |
98 |
13 |
51 |
59 |
61 |
50 |
23 |
204 |
32 |
- |
- |
- |
|
₹ 41,015.93
|
1 Piece(s)
|
|
5 Day(s) or more
|
3 |
60 |
- |
6.8 |
- |
- |
150 |
22 |
80 |
88 |
90 |
82 |
36 |
329 |
- |
181 |
51 |
1 unit |
Product Description
Side (horizontal) lifting clamp for steel plates, flat plates, iron plates, H-shaped steel, etc.
[Features]
·Thanks to the action of the spring, there is no need to hold the clamp by hand when attaching it. In addition, the clamp does not come off even when no load is applied.
·Safety points can be set on the main body for easy safety inspection and handling.
Part Number |
Minimum Order Qty. |
Volume Discount |
Days to Ship |
Basic Working Load (t) |
Maximum Clamp Width (mm) |
h1 (mm) |
Mass (kg) |
Features |
Application |
B (mm) |
t (mm) |
T (mm) |
b (mm) |
S.P. (Distance between Safety Points) (mm) |
D (mm) |
d (mm) |
L(MAX) (mm) |
h2 (mm) |
H1 (mm) |
H2 (mm) |
Amount Of Content |
|
₹ 19,875.53
|
1 Piece(s)
|
|
5 Day(s) or more
|
1 |
40 |
117.0 |
2000 |
Manual effort is not required when mounting the clamp due to the spring action and the clamp does not come off even in no-load state |
Clamp for Lateral (Horizontal) Lifting of Steel Plates / Boards / Road Plates / H-Shaped Steel, etc. |
98 |
13 |
51 |
59 |
61 |
50 |
23 |
204 |
32 |
- |
- |
- |
|
₹ 41,015.93
|
1 Piece(s)
|
|
5 Day(s) or more
|
3 |
60 |
- |
6.8 |
- |
- |
150 |
22 |
80 |
88 |
90 |
82 |
36 |
329 |
- |
181 |
51 |
1 unit |
Loading...
- The specifications and dimensions of some parts may not be fully covered. For exact details, refer tomanufacturer catalogs.
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy