(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
Select part number to Order Now/ Add to Cart
End mill for aluminum and copper alloys. Suitable for curved surface processing.
Part Number |
---|
2DLCR1.5 |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to Ship | R Size (mm) | Blade length (ℓ) (mm) | Overall Length (L) (mm) | Underneck length (ℓ1) (mm) | Shank diameter (d) (mm) | R Precision (μm) | Under-head Length ℓ2 (mm) | O.D. Dc (mm) | Outer Diameter Tolerance (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
₹ 5,853.58 | 1 Piece(s) | 5 Day(s) or more | 1.5 | 4.5 | 80 | 8 | 6 | 0~-0.03 | 8 | 3 | 15 |
Loading...
Type | Ball | work material | Aluminum / Copper | Number of flutes(sheet) | 2 |
---|---|---|---|---|---|
Coating | DLC | Machining Application | Curved surface / Side / Engraving / R Groove |
Please check the type/dimensions/specifications of the part 2DLCR1.5 in the DLC Mill, Ball 2DLCR series.
Part Number |
---|
2DLCR0.75 |
2DLCR1 |
2DLCR1.25 |
2DLCR10 |
2DLCR2 |
2DLCR2.5 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | R Size (mm) | Blade length (ℓ) (mm) | Overall Length (L) (mm) | Underneck length (ℓ1) (mm) | Shank diameter (d) (mm) | R Precision (μm) | Under-head Length ℓ2 (mm) | O.D. Dc (mm) | Outer Diameter Tolerance (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
₹ 5,843.55 | 1 Piece(s) | 5 Day(s) or more | 0.75 | 2.5 | 50 | 4 | 4 | 0~-0.03 | 4 | 1.5 | 10 | ||
₹ 6,362.55 | 1 Piece(s) | 9 Day(s) or more | 1 | 3 | 60 | 5 | 6 | 0~-0.03 | 5 | 2 | 15 | ||
₹ 5,850.55 | 1 Piece(s) | 5 Day(s) or more | 1.25 | 4 | 60 | 6 | 6 | 0~-0.03 | 6 | 2.5 | 15 | ||
₹ 40,496.22 | 1 Piece(s) | 5 Day(s) or more | 10 | 30 | 180 | - | 20 | 0~-0.04 | - | 20 | - | ||
₹ 5,853.58 | 1 Piece(s) | 5 Day(s) or more | 2 | 6 | 80 | 12 | 6 | 0~-0.03 | 12 | 4 | 15 | ||
₹ 6,334.60 | 1 Piece(s) | 5 Day(s) or more | 2.5 | 7.5 | 90 | 14 | 6 | 0~-0.03 | 14 | 5 | 15 |
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy