(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
Select part number to Order Now/ Add to Cart
Caution
Dedicated floor band for SGP pipe, stainless steel pipe, surface coated steel pipe, copper pipe, cast iron drainage pipe, and fire resistant dual pipe (FDP),
Floor Band for SGP pipe (vibration proof auxiliary)
[Features]
· A10408 floor band: floor band for SGP pipe, electrogalvanized finish.
· A10423 stainless steel floor band: floor band for stainless steel copper pipe.
· A10410CL floor band: floor band for surface coated steel pipe, electrogalvanized finish.
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to Ship | Main fit tube(or application tube)outside diameter (mm) | Compatible Pipe Type | Material | Surface Treatment | The size of diameter of steel pipe (A) | Nominal Diameter (B) | Compatible Pipe Outer Diameter (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
₹ 189.24 | 1 Piece(s) | 9 Day(s) or more | 20~Less than 30 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 15A | 1/2 | 21.7 | ||
₹ 179.85 | 1 Piece(s) | 7 Day(s) or more | 20~Less than 30 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 20A | 3/4 | 27.2 | ||
₹ 183.87 | 1 Piece(s) | 7 Day(s) or more | 30~Less than 40 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 25A | 1 | 34 | ||
₹ 193.25 | 1 Piece(s) | 7 Day(s) or more | 40~Less than 50 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 32A | 1 1/4 | 42.7 | ||
₹ 201.29 | 1 Piece(s) | 7 Day(s) or more | 40~Less than 50 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 40A | 1 1/2 | 48.6 | ||
₹ 218.71 | 1 Piece(s) | 7 Day(s) or more | 60~Less than 70 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 50A | 2 | 60.5 | ||
₹ 323.18 | 1 Piece(s) | 7 Day(s) or more | 70~Less than 80 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 65A | 2 1/2 | 76.3 | ||
₹ 264.24 | 1 Piece(s) | 7 Day(s) or more | 80~Less than 90 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 80A | 3 | 89.1 | ||
₹ 312.45 | 1 Piece(s) | 5 Day(s) or more | 100~Less than 200 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 100A | 4 | 114.3 | ||
₹ 499.98 | 1 Piece(s) | 7 Day(s) or more | 100~Less than 200 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 125A | 5 | 139.8 | ||
₹ 611.15 | 1 Piece(s) | 7 Day(s) or more | 100~Less than 200 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 150A | 6 | 165.2 | ||
₹ 1,129.49 | 1 Piece(s) | 8 Day(s) or more | 200~Less than 300 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 200A | 8 | 216.3 | ||
₹ 1,819.27 | 1 Piece(s) | 8 Day(s) or more | 200~Less than 300 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 250A | 10 | 267.4 | ||
₹ 3,101.07 | 1 Piece(s) | 11 Day(s) or more | 300~Less than 400 | [Steel Tubes / Coated Steel Tubes] SGP Pipe | Steel | Electrolytic Zinc Plating | 300A | 12 | 318.5 | ||
₹ 303.09 | 1 Piece(s) | 12 Day(s) or more | 20~Less than 30 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 15A | - | 25.7 | ||
₹ 316.47 | 1 Piece(s) | 12 Day(s) or more | 30~Less than 40 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 20A | - | 31.2 | ||
₹ 328.53 | 1 Piece(s) | 12 Day(s) or more | 30~Less than 40 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 25A | - | 37.6 | ||
₹ 345.95 | 1 Piece(s) | 12 Day(s) or more | 40~Less than 50 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 32A | - | 46.3 | ||
₹ 360.67 | 1 Piece(s) | 12 Day(s) or more | 50~Less than 60 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 40A | - | 52.2 | ||
₹ 455.20 | 1 Piece(s) | 12 Day(s) or more | 70~Less than 80 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 65A | - | 79.9 | ||
₹ 514.40 | 1 Piece(s) | 12 Day(s) or more | 90~Less than 100 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 80A | - | 92.7 | ||
₹ 550.40 | 1 Piece(s) | 12 Day(s) or more | 100~Less than 200 | [Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel Pipe | Steel | Electrolytic Zinc Plating | 100A | - | 118.3 |
Loading...
Type | Floor Band | Qty.(piece) | 1 |
---|
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy